Methven black range chosen for new London development

June 4, 2018

Methven UK, the global designer and manufacturer of premium showers and tapware, has secured a contract to work on a landmark luxury residential development in London.

Situated in Vauxhall, one of Europe’s largest regeneration zones, the new Keybridge development, built in distinctive brick, comprises six individual buildings, offering a total of 595 new homes from studio to three-bedroom apartments.

Methven has provided developers Mount Anvil and FABRICA by A2Dominion with a selection of products from its recently launched Methven Black collection for the Keybridge Capital building, which consists of 125 apartments. All bathrooms in the new development will feature a Methven Krome hand shower, Krome wall mounted 200mm shower head and arm and Kaha concealed thermostatic mixer valve with three outlets, all in matte black, as well as a matte black bath fill and overflow.

The hand shower, shower head and arm will also feature in all Keybridge Capital apartments boasting shower rooms, in addition to a matte black Kaha concealed thermMethvenostatic mixer valve with two outlets.

The Krome hand showers feature Methven’s Airstream™ technology, which draws air into the shower to mix with the water, creating more voluminous water droplets for a refreshing, rain-like shower experience. 

Taking its inspiration from the early 20th century brick towers of Manhattan, Keybridge’s developers, Mount Anvil and FABRICA by A2Dominion, chose to install Methven’s products after being impressed by their stunning range of designs.

Natalie Slack, Interior Design Manager at Mount Anvil, said:

“Keybridge Capital’s interior styling is timeless; an eclectic take on industrial, luxury loft style living. We specified the matte black faucets from Methven because this range offers a perfect synergy between design, quality and value.”

Also boasting a 15-metre swimming pool, gym, spa with sauna and steam room, 24-hour concierge service and residents’ business lounge, the first phase of the Keybridge development was completed in January 2018. The development is expected to be completed by 2020 and will be the latest residential development in both the public and private sectors which Methven has worked on.

For more information about Methven please click here

Add new comment